Public
Gurteen Wastewater Treatment Works, Sligo
The provision of new wastewater treatment plant to replace the existing
at Gurteen, Co Sligo. The contract involved the design and build of a
new wastewater treatment plant to cater for a population equivalent of
2500 people.
Services:
Structural design and detailing of the reinforced concrete water
retaining biotank structure
which houses a rotating mechanical aerator. Our scope of works also
included
assessment of the existing precast circular tank for re-use as a storm
overflow tank.
Civils contract value: €0.55m
Client: Response Civil Limited
Contractor: Response Civil
Limited
Architect:
Response Engineering Limited
Carney Wastewater Treatment Works, Sligo
The provision of new wastewater treatment plant to cater for a
population equivalent of 2500 people.
Services:
Structural design and detailing of the reinforced concrete water
retaining biotank
structure which houses a rotating mechanical aerator.
Civils contract value: €0.5m
Client: Response Civil Limited
Contractor: Response Civil
Limited
Architect:
Response Engineering Limited
Ballyfarnon Wastewater Treatment Plant, Roscommon
The provision of new water treatment plant to serve the town of
Ballyfarnon and the local environs in County Roscommon.
Services:
 Structural
design and detailing of driven piled foundations and water retaining
reinforced concrete bases to the aeration tank, the clarifier and the
sludge holding
tank associated with the new Ballyfarnon wastewater treatment plant in
Roscommon
Civils contract value: €0.75m
Client: Response Civil Limited
Contractor: Response Civil
Limited
Architect:
Response Engineering Limited |